Jackman Doubles in Size: Greater Efficiency, More Jobs

11 November 2026By Turbo Images

Jackman Doubles in Size: Greater Efficiency, More Jobs

Just 18 months after opening, Turbo Images’ production facility in Jackman, Maine, is reaching a new milestone. After six weeks of construction, an expansion that doubles the building’s footprint will be completed in the coming days.

A More Efficient Production Floor

The new area will be dedicated entirely to shipping and receiving. Moving these activities out of the production space gives the team a floor that is clearer, better organized, and easier to work on:

•    Less handling and fewer trips between workstations
•    Better project flow, from printing to shipping
•    Shorter turnaround times for our U.S. customers
•    Room to grow, with space for new equipment as demand increases

The Jackman facility produces and ships graphic projects for Turbo Images’ customers in the United States. The expansion strengthens its ability to serve the U.S. market quickly and efficiently, directly from American soil.



An Economic Driver for the Region

By setting up in Jackman, Turbo Images chose to invest in a small Maine community, and this expansion confirms that long-term commitment. The construction work was awarded to local contractors, so the project benefits the local economy directly.

The facility has also become part of the community. For the second year in a row, Jackman residents and community organizations were invited to our Community Day, and they turned out with enthusiasm.

We’re Hiring!

The Jackman team has grown steadily since day one. It now has 11 employees, and about ten new positions will open in 2027. The team could nearly double over the next year, creating stable, quality jobs for people in the region.
Turbo Images is always looking for passionate, driven people to join its production team.

Want to be part of the adventure? Apply now!